This is the free portion of the full article. The full article is available to licensed users only.
How do I get access?

Part-Period Balancing (PPB)

PPB is a dynamic lot-sizing technique which computes the production lot size after considering the next or the previous period's demands to determine if it would be economical to include them in the current lot.

Thus, the part period balancing (PPB) procedure uses more information in the requirements schedule than other procedures.